AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
130
Total No OHT
193
Covered Village
191
Regular Water Supply Village
1
Connected Device
1
Live Connected Device
0
No. of Scada Auto Μοde
974
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8135500 | Haraulipur GOV and Tubewell Scheme 125 Nos. | 63.31 | 5 | 12 | 181 | 0.00 | 1.39 | 455180.9 | 0.00 | 1231544.75 | 3671.79 | 8942.0 | 29.0 | 61565.89 | 3477.79 | 99480.06 | 3028.99 | 6.27 | 0.00 | 18.0 | 726.0 | |