AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
46
Total No OHT
129
Covered Village
128
Regular Water Supply Village
1
Connected Device
0
Live Connected Device
0
No. of Scada Auto Μοde
0
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8135488 | Pathyora Danda GOV | 104.61 | 9 | 46 | 125 | 7.30 | 0.59 | 0.0 | 0.00 | 2840590.50 | 31043.70 | 11624.0 | 48.0 | 4740483.00 | 10502.29 | 4324341.50 | 32298.98 | 8.38 | 0.15 | 18.0 | 3000.0 | |