AUTOMATION SYSTEM COMPONENTS DETAILS
1
Total No. Of Scheme
46
Total No OHT
129
Covered Village
128
Regular Water Supply Village
1
Connected Device
1
Live Connected Device
0
No. of Scada Auto Μοde
12223
Today Production Water
0
Ground Water Depth
0
Pump in Solar Mode
0
First Chlorine Tank
(Full/ Empty)
0
Second Chlorine Tank
(Full/ Empty)
| Sno. | Scheme Status | Scheme ID | Scheme Name | Avg LPCD | No.of CWR | No.of OHT | Covered Villages | INTAKE | WTP | ||||||||||||||
| INTAKE LEVEL | PRESSURE | Total Incomer Electricity KHW | Total DG Electricity KWH | Total Water FLOW | Today Water FLOW | TOTAL PUMP RUN HOUR (All Pump) | TODAY PUMP RUN HOUR (All Pump) | Total Raw Water FLOW | Today Raw Water FLOW | Total Clear Water FLOW | Today Clear Water FLOW | Clear Water pH | Clear Water Turbidity | Today Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | Total Chlorine Booster PUMP Run Hour (Total 2 BOOSTER) | ||||||||
| 1 | 8135488 | Pathyora Danda GOV | 133.53 | 9 | 46 | 125 | 8.24 | 0.39 | 1460864.8 | 0.00 | 4112468.75 | 24466.55 | 13230.0 | 37.0 | 4930268.50 | 24916.83 | 5861645.50 | 24661.23 | 8.06 | 0.00 | 18.0 | 3975.0 | |