Sno. Scheme Id Scheme Name OHT Code Covered Villages Households Total Population LPCD Today Water Production Overall Water Production OHT Low Level OHT High Level OHT Level Water In OHT() Residual chlorine
1 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW01 1 455 2106 49.60 104.46 35690.53 0.25 2.25 1.75 77.78 0.00
2 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW02 3 724 4946 55.07 272.38 69788.69 0.37 3.33 3.27 196.40 0.20
3 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW03 3 244 1795 8.73 15.67 629.97 0.30 2.70 1.86 103.33 0.21
4 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW04 6 354 2914 53.02 154.51 41172.07 0.37 3.33 3.31 173.95 0.20
5 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW05 3 1098 5299 54.78 290.29 85942.19 0.37 3.33 3.33 175.00 0.20
6 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW06 5 557 4193 90.84 380.88 57991.39 0.30 2.70 0.58 37.59 0.02
7 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW07 2 494 3667 327.24 1200.00 272155.40 0.00 0.00 2.45 225.00 0.20
8 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW08 3 478 2562 55.84 143.06 16804.79 0.35 3.15 0.96 60.95 0.01
9 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW09 1 236 1640 97.13 159.30 363.18 0.25 2.25 1.22 67.78 0.00
10 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW10 2 889 5561 54.20 301.38 84400.02 0.37 3.33 3.35 250.00 0.20
11 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW11 4 1241 4304 53.25 229.19 64116.50 0.37 3.33 3.41 175.00 0.20
12 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW12 2 224 1386 64.29 89.10 1490.16 0.30 2.70 0.20 12.96 0.01
13 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW13 2 267 2570 52.96 136.11 83325.36 0.25 2.25 2.22 98.67 0.01
14 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW14 1 553 3213 36.61 117.63 30444.47 0.30 2.70 1.07 69.35 0.00
15 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW15 3 282 2007 127.22 255.33 170808.48 0.35 3.15 1.01 72.14 0.01
16 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW16 6 579 4987 56.55 282.00 76096.20 0.37 3.33 3.33 225.00 0.20
17 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW17 3 593 4089 85.26 348.62 54096.28 0.30 2.70 0.17 9.44 0.43
18 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW18 4 469 3531 56.45 199.33 73286.21 0.25 2.25 0.91 50.56 0.21
19 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW19 2 262 1636 0.91 1.49 428.18 0.25 2.25 -0.62 -34.44 0.00
20 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW20 1 408 3065 52.04 159.50 36824.75 0.37 3.33 3.36 125.00 0.20
21 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW21 3 382 3105 51.82 160.91 46583.87 0.37 3.33 3.31 173.95 0.20
22 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW22 6 576 6046 108.50 655.99 59156.88 0.35 3.15 2.55 161.90 0.01
23 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW23 3 605 4048 29.51 119.45 50757.29 0.30 2.70 0.43 23.89 0.11
24 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW24 2 254 1191 29.91 35.62 3021.98 0.35 3.15 0.66 41.90 0.03
25 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW25 5 780 4785 56.86 272.07 106374.55 0.37 3.33 3.36 175.00 0.20
26 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW26 3 430 4043 54.28 219.44 72597.27 0.37 3.33 3.39 200.00 0.20
27 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW27 5 551 4387 52.71 231.25 72485.60 0.37 3.33 3.36 225.00 0.20
28 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW28 3 526 4816 45.96 221.35 78138.67 0.37 3.33 3.28 221.62 0.20
29 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW29 1 93 1155 35.71 41.24 689.34 0.25 2.25 0.01 0.44 0.00
30 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW30 7 1657 11551 53.63 619.44 128298.56 0.37 3.33 3.30 198.20 0.20
31 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW31 1 443 3077 20.23 62.26 26509.25 0.25 2.25 0.82 45.56 20.78
32 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW32 1 375 3202 130.46 417.72 52231.81 0.25 2.25 1.48 82.22 0.01
33 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW33 1 690 4713 41.75 196.78 78246.30 0.35 3.15 1.87 118.73 0.06
34 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW34 3 646 4986 13.34 66.50 46622.27 0.35 3.15 2.92 185.40 0.21
35 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW35 3 1338 5616 64.44 361.87 183279.69 0.35 3.15 2.16 137.14 0.21
36 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW36 2 494 3744 35.64 133.42 47019.12 0.25 2.25 1.43 79.44 0.21
37 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW37 5 834 4717 12.56 59.23 51535.87 0.25 2.25 1.11 86.33 0.00
38 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW38 2 610 4661 40.05 186.67 33106.64 0.35 3.15 0.85 53.97 0.21
39 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW39 2 1727 12404 24.27 301.10 79647.35 0.37 3.33 3.35 450.00 0.20
40 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW40 1 460 3662 17.97 65.79 902.23 0.45 4.05 0.00 0.00 0.00
41 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW41 1 572 4335 47.54 206.07 58305.63 0.37 3.33 3.38 200.00 0.20
42 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW42 1 773 5336 54.97 293.30 51620.82 0.37 3.33 3.38 175.00 0.20
43 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW43 2 1060 9249 128.23 1186.01 18302.50 0.40 3.60 1.92 173.33 0.21
44 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW44 1 1299 9760 54.78 534.63 143991.02 0.37 3.33 3.34 400.00 0.20
45 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW45 2 655 5715 49.59 283.43 5168.66 0.30 2.70 1.43 92.69 0.21
46 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW46 1 266 2166 0.01 0.03 18531.22 0.25 2.25 0.00 0.00 0.00
47 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW47 2 292 2849 56.67 161.46 39533.24 0.37 3.33 3.36 125.00 0.20
48 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW48 2 211 1849 8.59 15.89 8824.62 0.25 2.25 0.51 28.33 1.50
49 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW49 2 590 4169 56.02 233.53 38933.23 0.37 3.33 3.31 149.10 0.20
50 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW50 1 241 1972 80.81 159.36 12531.48 0.25 2.25 2.52 100.00 0.01
51 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW51 4 1994 9068 1.06 9.64 1201.44 0.45 4.05 5.93 350.00 0.11
52 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW52 6 1088 7099 11.70 83.05 252194.32 0.40 3.60 2.57 232.01 0.05
53 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW53 2 738 4829 52.93 255.59 77390.09 0.37 3.33 3.35 150.00 0.20
54 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW54 5 847 6175 5.44 33.59 78.33 0.35 3.15 1.85 132.14 0.01
55 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW55 5 942 5188 24.32 126.15 1644.52 0.30 2.70 0.87 56.39 0.45
56 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW56 3 749 4009 29.75 119.28 37140.63 0.25 2.25 0.50 27.78 0.00
57 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW57 5 754 4932 64.46 317.93 46993.11 0.35 3.15 2.30 164.29 3.42
58 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW58 2 373 2500 45.66 114.14 81686.44 0.25 2.25 2.08 138.67 0.00
59 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW59 1 688 4447 56.60 251.70 52787.96 0.37 3.33 3.40 275.00 0.20
60 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW60 3 550 4631 56.63 262.24 55656.14 0.37 3.33 3.39 150.00 0.20
61 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW61 2 659 4318 55.72 240.60 63344.59 0.37 3.33 3.31 213.71 0.20
62 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW62 2 806 4541 44.93 204.04 54631.10 0.25 2.25 0.18 10.00 0.01
63 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW63 2 724 4258 53.81 229.13 61908.00 0.37 3.33 3.36 125.00 0.20
64 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW64 2 332 2414 10.28 24.81 11606.26 0.25 2.25 1.95 86.67 0.07
65 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW65 2 332 2414 60.68 146.48 643.82 0.30 2.70 -0.75 -27.78 0.21
66 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW66 4 741 4476 13.03 58.30 27499.79 0.30 2.70 1.06 68.70 0.21
67 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW67 3 1018 5850 64.85 379.39 95103.90 0.35 3.15 3.50 200.00 0.01
68 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW68 2 683 4061 91.48 371.49 32055.71 0.30 2.70 0.01 0.65 0.00
69 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW69 3 1261 4711 0.00 0.00 0.00 0.30 2.70 0.00 0.00 2.10
70 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW70 2 678 2897 61.04 176.82 22368.55 0.30 2.70 2.83 175.00 0.21
71 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW71 1 753 5130 42.74 219.24 60792.19 0.35 3.15 1.34 85.08 1.20
72 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW72 1 550 4065 40.88 166.17 64632.75 0.30 2.70 1.74 96.67 0.13
73 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW73 2 428 2928 54.32 159.05 46876.99 0.37 3.33 3.38 150.00 0.20
74 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW74 13 1626 8564 1.84 15.77 3827.99 0.35 3.15 3.51 200.00 0.14
75 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW75 4 547 5337 32.63 174.16 9168.69 0.35 3.15 3.30 200.00 0.00
76 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW76 2 735 5008 0.00 0.01 18.51 0.35 3.15 -0.87 -55.24 0.00
77 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW77 1 496 3567 63.64 226.99 25177.68 0.30 2.70 1.26 70.00 0.21
78 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW78 4 455 3067 55.93 171.55 48982.89 0.37 3.33 3.36 125.00 0.20
79 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW79 1 554 2735 39.20 107.22 26998.49 0.37 3.33 3.40 125.00 0.20
80 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW80 1 215 1726 41.71 72.00 59739.76 0.30 2.70 0.36 23.33 0.21
81 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW81 1 411 3036 53.94 163.75 44537.73 0.37 3.33 3.38 125.00 0.20
82 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW82 1 745 3239 52.03 168.54 52036.35 0.37 3.33 3.34 150.00 0.20
83 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW83 3 1029 7631 53.69 409.69 122341.95 0.37 3.33 3.35 175.00 0.20
84 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW84 1 1203 9320 10.82 100.86 26700.33 0.37 3.33 3.29 296.40 0.20
85 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW85 3 690 3250 33.36 108.42 26686.54 0.37 3.33 3.34 125.00 0.20
86 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW86 1 333 2254 42.57 95.96 26779.09 0.37 3.33 3.35 175.00 0.20
87 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW87 3 491 5020 19.25 96.63 26649.75 0.37 3.33 3.34 150.00 0.20
88 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW88 2 654 5176 53.17 275.22 82956.10 0.37 3.33 3.41 275.00 0.20
89 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW89 2 942 5967 53.63 320.02 95594.17 0.37 3.33 3.33 200.00 0.20
90 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW90 1 874 5091 54.96 279.80 81914.12 0.37 3.33 3.28 147.75 0.20
91 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW91 1 543 3828 57.03 218.30 61298.53 0.37 3.33 3.34 125.00 0.20
92 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW92 2 483 3268 53.38 174.46 52535.35 0.37 3.33 3.38 125.00 0.20
93 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW93 3 710 4659 45.21 210.62 44957.12 0.15 1.35 -0.37 -47.96 0.26
94 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW94 1 967 5919 34.36 203.38 250.67 0.35 3.15 2.58 163.81 0.11
95 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW95 4 623 4912 20.46 100.48 24819.05 0.37 3.33 3.32 149.55 0.20
96 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW96 3 873 5073 17.51 88.83 94687.70 0.32 2.88 0.56 29.17 0.08
97 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW97 1 533 3567 29.45 105.06 24969.63 0.37 3.33 3.40 125.00 0.20
98 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. 2025GW98 1 326 1439 52.35 75.33 13642.13 0.37 3.33 3.30 113.96 0.20
99 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. OHT-1 6 1921 12523 54.70 685.01 311262.93 0.00 0.00 0.00 0.00
100 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. OHT-2 10 1657 11451 5.85 67.04 97909.10 0.00 0.00 0.00 0.00
101 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. OHT-3 9 951 6154 113.83 700.53 140727.57 0.00 0.00 0.00 0.00
102 8153275 Mahauri GOV and Tubewell Scheme 98 Nos. OHT-4 3 415 3279 213.64 700.53 140619.72 0.00 0.00 0.00 0.00